Platform Evolution
Assessment run-2026-07-27-1 · 213 of 213 repos assessed
Repos / phenix-attractions

phenix-attractions

Phenix attractions product: API for searching, quoting and booking attraction tickets/excursions, plus a legacy WCF configuration service and back-office integration.

54 · ambermediumkernelOn-premZDD: a long roadapi

Health score

54

0 to 100 across seven weighted factors; nothing is hidden. Green is 75 and above, amber 50 to 74, red below 50. How scoring works.


Runtime currency / 25
0
.NET Framework, out of mainstream support
Legacy transport / 15
2
Hosts WCF or SOAP endpoints with no successor on modern .NET
Test posture / 15
15
Good test coverage
Security hygiene / 15
15
No credentials found in source
Dangerous coupling / 15
8
shares a core database (sqlserver:Phenix)
Activity / 10
10
Actively maintained
Deployment hygiene / 5
5
CI in place
Health over time
2026-07-24 (run-2026-07-24-1): 542026-07-27 (run-2026-07-27-1): 54
No change since 2026-07-24 (54 to 54).

Facts

Languagescsharp, sql
FrameworksASP.NET Core 8, WCF, FluentResults
Runtimes.NET 8, .NET Framework 4.6.2
Tests / CIgood / CI in place
Last commit2026-07-23
OwnerOwner unknown (mapping to be curated)
DomainSelling and quoting (system generated; curate in repo-owners.json to override)
Product areaPhenix
HostedOn-prem Deployed to our own machines
  • Release "\commercial\attractions\attractions-api": QA: deployment-group phase (agents on our own machines)
  • Release "\commercial\attractions\attractions-api": Staging: deployment-group phase (agents on our own machines)
  • Release "\commercial\attractions\attractions-api": Production: deployment-group phase (agents on our own machines)
  • Release "\commercial\attractions\attractions-api": Training: deployment-group phase (agents on our own machines)
  • Release "\commercial\attractions\attractions-api": DR: deployment-group phase (agents on our own machines)
Releases2 release pipeline(s): \commercial\attractions\attractions-api; \commercial\attractions\attractions-configuration-service
Integrationrest, wcf, redis
SourceOpen in Azure DevOps

Risk flags

Each flag links to its glossary definition.

Dependencies in context

Laying out the graph…
greenamberreddata store (square, dashed link)Node size follows fan-in. Click any node to open it.

Entanglement

kernel Bound into the core by 2 mechanism(s).

Detaches when its WCF surface gains a modern interface or its WCF calls move to one; and when the shared database group it belongs to gains an owned API or completes schema separation (sqlserver:Phenix).

Migration playbooks

Generated from this repo's assessment data: what is feasible, what blocks it, and the steps in order. Ratings: green means actionable now, amber means sequence other work first, red means blocked, grey means not applicable.

ZDD adoption

A long road

Technically eligible one day, but the blockers are structural: hosted WCF or SOAP contracts that cannot run two versions at once, or heavy legacy coupling. Sequence the modernisation work first. Hosts WCF or SOAP endpoints: strict serialization contracts cannot safely run two versions at once (the shared-enum trap). End-of-life runtime compounds the work. Shares sqlserver:Phenix: schema changes move in convoy.

Blockers
Dependencies and gotchas
  • 1 system(s) depend on this repo; during a rolling deploy they will talk to old and new versions at once, so responses must stay compatible
  • Shares sqlserver:Phenix with 21 system(s): destructive schema change is prohibited in a single release; expand and contract only
  • Serialized state or messages in flight (Redis or queues): new code must deserialize objects written by the previous version
  • Session is externalised to Redis: keep it that way, and check session object compatibility between versions
Steps
  1. Adopt the four-stage discipline from the ZDD engineering standard: pre-deployment compatibility, deployment, feature activation behind a flag, post-release cleanup.
  2. Make every change dual-version safe: backwards-compatible APIs (new major version for breaking wire changes), expand and contract for any schema change, and consumers tolerant of unknown fields.
  3. Audit serialized data: anything in Redis, queues or shared caches must deserialize cleanly across adjacent versions.
  4. Wrap behaviour changes in feature flags so code deploys dark and release becomes a business decision, not a deployment event.
  5. Route deployments through the Workflow Engine's automated drain, deploy, health-check, return cycle (the path proven by the first automated production run in mid-2026).
  6. Verify with area-scoped regression rather than the whole-platform cycle, and watch error rates after rollout with automated rollback on alert.

SQL Server exit

Blocked by a shared core database

sqlserver:Phenix, sqlserver:AttractionsRepository are shared, so this system cannot change engine on its own: every sharer moves in convoy. The stage 4 work (named owner, declarative schema, owned API) has to land first; after that, the steps below apply to whatever slice this system ends up owning.

Blockers
Steps
  1. Inventory the schema and query surface of sqlserver:Phenix, sqlserver:AttractionsRepository, sqlserver:ProviderArabianAdventures: tables, stored procedures, triggers, cross-database joins and anything else engine-specific.
  2. Confirm the target: PostgreSQL (relational model; keep transactions and joins, swap the engine).
  3. Replatform to modern .NET first (see the recommended actions): current PostgreSQL and MongoDB drivers and EF Core providers target modern .NET, and doing one risky change at a time is cheaper than doing two.
  4. Data access is not through an ORM, so port the SQL by hand: translate T-SQL constructs, replace stored procedures with application code or target-native equivalents, and add integration tests around the queries that matter first.
  5. Stand up the target alongside SQL Server, backfill with an ETL pass (pgloader or an export/import job), then dual-write or replicate until parity is proven.
  6. Move reads to the target, watch correctness and latency, then cut writes over and keep SQL Server read-only until confidence is earned.
  7. Decommission the SQL Server database and remove the connection strings and firewall paths that pointed at it.

Containerisation

Feasible after replatforming

Appropriate eventually, but not from here: the legacy runtime and the hosted WCF surface both have to go first, and that work is already in this repo's recommended actions.

Blockers
Steps
  1. Replatform to modern .NET first (see the recommended actions), replacing the hosted WCF/SOAP surface with REST, gRPC or messaging so consumers can follow. Containerising then becomes routine.
  2. Add a Dockerfile and make the app read all configuration from environment variables and the secrets manager, never from machine-local files.
  3. Log to stdout and expose a health check endpoint so ECS can supervise it.
  4. Adopt the shared ci.yml pipeline template with the container parameters (awsRegion, containerAfterBuild, ecsTerraformRepo), which is exactly how the estate's existing AWS services deploy.
  5. Define the service in the Terraform repo, deploy to a non-production environment, then shift traffic and disarm the deployment-group release pipeline.

Recommended actions

Replatform phenix-attractions to modern .NET

Runs on .NET 8, .NET Framework 4.6.2, out of mainstream support. No pinning dependency blocks it; sequence by fan-in (providers before consumers). Shares sqlserver:Phenix, so batch it with its database group (stage 4).

Impact: Unblocks 1 dependent system(s)

proposed

Assessment notes

phenix-attractions

Purpose

Owns the attractions component of the Phenix selling platform: the Attractions.Api handles search, quote-basket integration, pricing/markup and booking of attractions (with Arabian Adventures as a supplier-backed provider database), while a legacy configuration WCF service host manages attraction configuration. Back-office integration projects push bookings downstream.

Tech stack

Mostly C# on .NET 8 (API, service, configuration API and tests) with central package management, StyleCop and rulesets; the API ships a Dockerfile and docker-compose. Legacy remnants on .NET Framework 4.6.2: the configuration WCF service host and service contract. Redis-backed remote session (TC.RemoteSession.Redis).

Deployment

Two build pipelines matching in-repo YAML (build-api.yml for phenix-attractions-api, build-configuration.yml for phenix-attractions-configuration-service-host), released via \commercial\attractions\attractions-api and attractions-configuration-service; release_count 2. Builds use shared InternalOSS/azure-pipelines-templates with .NET 8 SDK.

Dependencies

Internal (via TC NuGet packages and service clients): tc-connectionbroker, tc-exceptions, phenix-place-repository, phenix-quote (quote service contract/API client), tax-service, service-fee-api and tc-phenix-cancellation; back-office facade/integration and quote-system, booking-document and user-account clients call the wider Phenix/back-office estate. Reads the shared Phenix database owned by phenix-database. External: Arabian Adventures attraction supplier data.

Data stores

Shared Phenix SQL Server database plus AttractionsRepository and ProviderArabianAdventures SQL databases (resolved via ConnectionBroker); Redis for remote session state.

Integration points

Inbound REST API consumed by the Phenix quote/selling UI; legacy WCF configuration endpoint; outbound WCF/REST to quote, tax, service-fee, cancellation and back-office services; Redis session sharing with the Phenix web estate.

Code health

Good: unit tests across API, service, configuration and back-office integration, plus a dedicated integration-test project and shared testing library. CI in place. Last commit 2026-07-23, actively developed.

Modernisation risks

Configuration service host remains WCF on .NET Framework 4.6.2 (EOL) and needs replacing with the newer configuration API. Coupling to the shared Phenix database and binary-serialised Redis session ties it to legacy platform patterns. Core API itself is modern .NET 8.